|
This report presents budget and expenditures from the federal funds
and local anticipated in-kind or cash match in contributions and the calculated
Match. Detailed materials are on file here in support of the various elements
presented. A summary discussion is presented where there are alterations
from the budget narrative presented with the initial proposal.
In regard to "project-related activities funded by non-Federal
sources," please note:
- In May, 1996, AT&T awarded GSU a grant of $20,000 for a
regional
conference on community technology with a primary focus on the emergence
of the Lincoln Networks.
- We are anticipating an announcement of a grant for $34,000 from another
telecommunications company in support of the "Voices of Phoenix"
telephone networking project.
- The impact of the Lincoln Networks, through the LincolnNet and through
the various projects in telephony, played a major role in the refunding
for another two years of the work of the South Metropolitan Regional Leadership
Center (for a total of $400,000 over the next two years).
BUDGET REVIEW WITH EXPENDITURES OF FEDERAL
FUNDS AND IN-KIND MATCHES:
The Budget Narrative reflects the involvement of a wide variety of personnel
at various levels of time commitment.
Project Staff:
In the federally funded portion, we expended funds for the four positions
indicated: Project Director, Technical Manager, Training Manager, and Clerical
Support. As indicated in our memo of Feb. 14, 1996, there were two changes
of significance: a) individual salary amounts were changed due to changes
in staff and the integration of the Lincoln Project into the Regional Leadership
Center, and b) given the broad "grass roots" nature of the project
as it evolved, the Training Manager position became the "Training
Team" reflecting the involvement of a number of persons paid to participate
as training managers.
Outside Evaluation Team:
Cash payment through Center for Extended Learning.
Technical Assistance:
Technical assistance from throughout the University for technology conferences,
videoconferencing, training programs
GSU Faculty/staff Liaisons/Teams:
8 key staff played critical liaison roles within our regional development
project, in addition, we have calculated partial participation by other
faculty on short term projects
Dean’s Campus-wide leadership:
As proposed:
RAP/2000+ Research Associate:
As proposed with revised budget:
RAP/2000+ Community Resource Teams:
The forms of participation led to significant contributions by five
community representatives and four community based "teams." Estimates
of times and value of in-kind contributions were calculated for all. This
was a revised budget item.
RAP/2000+ Support staff:
As proposed:
The Educational Computer Network:
As proposed:
FRINGE BENEFITS:
As proposed in revised budget:
As proposed in revised budget :
Benefits were calculated as planned, at 20.0% of base salary. Because
of the timing on hiring and the evolution of the "Training Team"
approach, the expenses were somewhat less than anticipated.
TRAVEL:
As was proposed, this covered travel costs that were local in nature.
In addition, these funds were used to cover part of the costs related to
participation by the Project Director in the TIIAP Workshop in June, 1996.
The local match was used as proposed for meeting related expenses.
EQUIPMENT:
As proposed in revised budget:
As indicated in the covering memo, expenses related to equipment, software,
contractual services, and telecommunications are inter-related. In this
section, we have identified the major equipment items and their costs as
these developed in response to the needs of the project. Obviously, both
because of changes in the technologies and changes in the movement of the
project, these configurations differ from those originally proposed.
For the LincolnNet we acquired a Sun Ultra 1 -- Model 140 to run the
webserver, news-server, mail server, Real Audio server (with the capacity
for 80 streams), and other utilities. This has 128 MB memory, 6 GB of disk
storage for systems software, user homepages, e-mail boxes, etc. With it
is one tape drive which produces 5 GB tapes for daily backup of all user
data. This is supported by two terminal servers each supporting 16 modems
for dial-in access. All is on an Ethernet network connecting with the University
to the Internet. In support of the LincolnNet we have installed and configured
four work stations for maintenance, development and data sharing, and for
overall support of our regional development activities. These are tied
to the Ethernet network and are also used for sound editing and digitizing.
For the Lincoln InfoLine and our telephony networking, we have two on-line
systems/servers, and one off-line server for program development. The system/server
located in Phoenix for the "Voices of Phoenix" network using
2 (or now 4) incoming lines with the capacity to grow in that community
and add service to other communities. The GSU system/server has 12 incoming
lines.
Major equipment for LincolnNet:
| Sun Ultra-1 system |
|
| Cisco Systems Ethernet elements |
|
| Token Ring Card & related equip |
|
| Ethernet Hub & transceivers 751 32 modems |
|
Major equipment for telephony networks:
| Telephony server & support |
|
| Telephony server & related material |
|
| Telephony boards & related material |
|
| Broadway mped board & related |
|
| Editing equipment |
|
Work Stations for Lincoln Networks:
| Initial 3 stations and support equipment |
|
| Add’l work station and support equip. |
|
SUPPLIES:
As proposed, this covered basic office and project supplies.
CONTRACTUAL:
OTHER:
Note that the first column is the revised budget numbers from the original
budget narrative listed under Contractual and Other, the second column
reflects expenses recorded as "Contractual Services" and for
"Telecommunications."
As indicated in the introduction, the evolution of the project in meeting
the stated goals led to a variety of alterations in terms of the materials,
connectivity, software, and other elements needed to build the Lincoln
Networks. We found for example that connectivity for the LincolnNet through
the University’s systems to the Internet proved to be very adequate, however,
there were a variety of connectivity costs in establishing the "Voices
of Phoenix" telephony systems in that low income community.
As indicated, Contractual Services costs were intimately tied into Telecommunications
expenses and were related to various kinds of equipment costs. Major items
included the following:
CONTRACTUAL EXPENSES:
| Telephony software |
|
| Telephony editing materials |
|
| Tapes, tape drive, etc. |
|
| Teleconferencing support |
|
| Voices of Phoenix telephony package |
|
| Sun Systems Maintenance Contract |
|
| Real Audio software upgrades |
|
| LincolnNet systems software |
|
| Tech Support & Training services |
|
| Lincoln Networks meetings support |
|
| LincolnNet design & printing services |
|
| Contractual, registration fees |
|
| Lincoln Networks/TIIAP ads, publicity, etc. |
|
TELECOMMUNICATIONS EXPENSES:
| Connectivity for lines for dial-up access |
|
| Connectivity for "Voices of Phoenix" |
|
| "Voices of Phoenix" Telecom support |
|
The LOCAL MATCH noted here included cash contributions in the RAP/2000+
operating budget to pay for Telephones and postage and for Publications
and data.
PLEASE NOTE: the major expense items outlined include the designation
of $6,114 (for the original budgeted amount of $6100) particularly for
publicity related costs for regional awareness of TIIAP and the Project.
INDIRECT CHARGES:
As proposed in the original budget, GSU applies an indirect cost rate
percentage on all direct cost categories except equipment.
Back to the report menu
|